January 2015

Malahide Viaduct

The causeway supporting the pier foundations for the railway viaduct had been subjected to several programmes of grouting. The work specification was prepared by C.I.E. and a constant check had to be kept on the grout levels during injection, to ensure a sufficient spread was being maintained in the strata below the viaduct. Each span and […]

Malahide Viaduct Read More »

Berth 50 Extension

The works are the extension landward of the existing Berth 50 within Dublin Port by 50 metres to provide additional berthing capacity within a load-on, load-off container handling/shipping facility. We were sub-contracted by BAM to install 58 No. 40 metre long permanent double corrosion protected rock anchors with working loads up to 1200kN.

Berth 50 Extension Read More »

Wyattville Bridge

Owing to the increase in traffic from the M50 into Dun Laoighaire and the increase of urban development in South County Dublin, the interchange at Wyattville was upgraded. This interchange facilitates a traffic fl ow of 50,000 vehicles a day and is the second busiest section of motorway in Ireland. The new Wyattville overbridge runs East to West over

Wyattville Bridge Read More »

Trinity Biosciences, University of Dublin (Trinity College)

This facility which is due to open in 2011 will accomodate Trinity’s Institute of Immunology, a Centre of Excellence in Cancer Drug Discovery, Institute of Neuroscience and Trinity’s Bioengineering Centre. Its opening will coincide with the tercentenary of medical education in 2011. The building will accomodate around 1,000 researchers by 2013. Our involvement in the project arose from

Trinity Biosciences, University of Dublin (Trinity College) Read More »