by Colm Edwards | Jan 9, 2015 | Case Studies, Malahide Viaduct
The causeway supporting the pier foundations for the railway viaduct had been subjected to several programmes of grouting. The work specification was prepared by C.I.E. and a constant check had to be kept on the grout levels during injection,...
by Colm Edwards | Jan 9, 2015 | Case Studies
The works are the extension landward of the existing Berth 50 within Dublin Port by 50 metres to provide additional berthing capacity within a load-on, load-off container handling/shipping facility. We were sub-contracted by BAM to install 58...
by Colm Edwards | Jan 9, 2015 | Case Studies, Wyattville Bridge
Owing to the increase in traffic from the M50 into Dun Laoighaire and the increase of urban development in South County Dublin, the interchange at Wyattville was upgraded. This interchange facilitates a traffic fl ow of 50,000 vehicles a day...
by Colm Edwards | Jan 9, 2015 | Case Studies, Trinity Biosciences
This facility which is due to open in 2011 will accomodate Trinity’s Institute of Immunology, a Centre of Excellence in Cancer Drug Discovery, Institute of Neuroscience and Trinity’s Bioengineering Centre. Its opening will coincide with...
by Colm Edwards | Nov 5, 2014 | Case Studies, Portlaoise Shopping Centre
Phase 1 of this project, carried out in 2007, required the construction of a triple basement with a retained height of 13.5 metres. Over most of the site the rock level within the basement was 3 to 4 metres above formation level. Our proposed solution was...