Malahide Viaduct

Malahide Viaduct

The cause­way sup­port­ing the pier foun­da­tions for the rail­way viaduct had been sub­ject­ed to sev­er­al pro­grammes of grout­ing. The work spec­i­fi­ca­tion was pre­pared by C.I.E. and a con­stant check had to be kept on the grout lev­els dur­ing injec­tion,...
Berth 50 Extension

Berth 50 Extension

The works are the exten­sion land­ward of the exist­ing Berth 50 with­in Dublin Port by 50 metres to pro­vide addi­tion­al berthing capac­i­ty with­in a load-on, load-off con­tain­er handling/shipping facil­i­ty. We were sub-con­tract­ed by BAM to install 58...

Wyattville Bridge

Owing to the increase in traf­fic from the M50 into Dun Laoighaire and the increase of urban devel­op­ment in South Coun­ty Dublin, the inter­change at Wyattville was upgrad­ed. This inter­change facil­i­tates a traf­fic fl ow of 50,000 vehi­cles a day...

Portlaoise Shopping Centre

Phase 1 of this project, car­ried out in 2007, required the con­struc­tion of a triple base­ment with a retained height of 13.5 metres. Over most of the site the rock lev­el with­in the base­ment was 3 to 4 metres above for­ma­tion lev­el. Our pro­posed solu­tion was...