George’s Quay, Dublin
Whilst the piling works on this site were technically unchallenging it is one of those contracts that we find very pleasing to be associated with. The building is visually very striking and has a fantastic location overlooking the River Liffey.
Specialist services:
The piling works involved the installation of 473 No. 600mm Ø CFA bearing piles founded on limestone rock, with a SWL of 2000kN. The rig used on this site was a Llamada P90 CFA rig.