by Colm Edwards | Nov 5, 2014 | CFA, Techniques
Installation process CFA piles are formed by drilling a continuous flight auger into the ground. The sides of the hole are supported at all times by the soil-filled auger, eliminating the need for temporary casing or bentonite slurry. Upon reaching the...